==Flush Mounting Procedure==
 
==Flush Mounting Procedure==
[[File:TCIS Flush Mounting.PNG]]
+
'''NOTE! The gasket MUST be mounted to seal the station!'''
 +
 
 +
[[File:TCIV Mounting 2.png|500px]]
  
 
:1.  Mount the 2-gang back box into the wall
 
:1.  Mount the 2-gang back box into the wall

Latest revision as of 06:51, 18 October 2016

  Dimensions (WxHxD) Weight
TCIV 180 x 120 x 70 mm 1.0 kg
TCIV after flushmount 180 x 120 x 20 mm
TCIV with onwall box 180 x 120 x 82 mm

TCIV Compact Station Dimensions

TCIV Video Station - Front view TCIV Video Station - Side view


Onwall Surface Mounting

On-Wall Surface Mount Back Box - TA-1

Mounting holes are to be drilled as shown.

Max. recommended screw diameter: ISO M6 or ANSI 1/4". Screw length must be greater than 25 mm or 1". A4 stainless steel socket head screws/bolts are recommended. Max. recommended screw head diameter: 9.5 mm or 3/8".

Optional nylon washers for extra protection against corrosive effects between surfaces are provided. They should be placed at the bottom of the mounting holes. Grommets and an M20 cable gland are provided.

Onwall backbox Mounting holes - Side view Onwall backbox - Side view


On-Wall Surface Mounting Procedure

NOTE! The gasket MUST be mounted to seal the station!

Onwall mounting - exploded view

1. Mount the back box onto the wall
2. Fit the gasket onto the back box with the ridged side facing down
- Plug the Ethernet cable into the RJ-45 port on the station
3. Mount the Turbine station onto the back box with the M5 fasteners provided
Ensure the station is mounted vertically with the microphone aperture facing down
Ensure there is enough clearance under the station so that the microphone aperture is not smothered
Use the grommets and M20 cable gland provided for the cable holes on the back box

Flush Mounting

Flush Mount 2-Gang Back Box - TA-2

TA2 2-Gang backbox dimensions

Note! It is recommended to utilize back boxes with weep holes at the bottom


Flush Mount Bracket - TA-5

Fits US 2-GANG electrical boxes. Recommended screw diameter: up to M4 (5/32"). Use screw recommended by back box manufacurer.

TA-5 Mounting Bracket dimensions TA-5 Mounting Bracket

Note! The TA-5 Bracket is mandatory for flush mounting.


Flush Mounting Procedure

NOTE! The gasket MUST be mounted to seal the station!

TCIV Mounting 2.png

1. Mount the 2-gang back box into the wall
2. Mount the bracket onto the back box
3. Fit the gasket onto the bracket with the ridged side facing down
–Plug the Ethernet cable into the RJ-45 port on the station
4. Mount the Turbine station onto the bracket with the M5 fasteners provided
Ensure the station is mounted vertically with the microphone aperture facing down
Ensure there is enough clearance under the station so that the microphone aperture is not smothered