Actions

1-1a. Exchange startup (practice): Difference between revisions

From Zenitel Wiki

Line 10: Line 10:
*Test calling and conversation between the two stations
*Test calling and conversation between the two stations


----
<br><br><br><br>


===Related articles ===
===Related articles ===

Revision as of 15:37, 15 March 2011

Practice 1-1a:

System configuration


Exchange startup:

  • Install an ASLT board and an AMC-IP board
  • Connect two master stations to physical 1 and 2
  • Connect power and start the exchange
  • Perform a Coldstart (autoload)
  • Test calling and conversation between the two stations





Related articles










MediaWiki spam blocked by CleanTalk.