Actions

Difference between revisions of "IP Flush Master DAK-48 Module"

From Zenitel Wiki

 
(29 intermediate revisions by 3 users not shown)
Line 1: Line 1:
[[File:DAK48.jpg|thumb|DAK-48 Unit]]
+
{{AI}} [[File:D48-newZ.png|thumb|400px|DAK-48 Unit. Item number: 1008010100]]
:* Item number: [[DAK48 module - 1008010100|1008010100]]
+
The '''IP DAK-48 unit''' expands the:
 +
* [[IP Flush Master -V2]]
 +
* [[IP Flush Master - 1008031000|INCA IP Flush Master Station]]
 +
with an additional 48 Direct Access Keys. Up to two DAK-48 units can be connected to one station.
  
'''Note!''' The license 1009648001 is required to extend the IP Flush Master with the optional IP DAK-48 Unit.
+
==Software and license requirements==
 
+
'''Software:'''
===<u>Highlights</u>===
+
* IP Flush Master (INCA): Version 01.09.3.0 or later
*Extends IP Flush Master Station with 48 programmable DAK keys (direct access keys)
+
* IP Flush Master (Turbine): Version 6.0.3.0 or later
*Ideal for control room applications
 
*Visual indications with two LEDs (green/red) per DAK key
 
*All keys have backlight (adjustable)
 
*Easy labeling of keys
 
 
 
===<u>Software requirements</u>===
 
* IP Flush Master: Version 01.09.3.0 or later
 
 
* AMC-IP: Version 10.60.3.0 or later
 
* AMC-IP: Version 10.60.3.0 or later
  
==Installation==
+
'''License:'''
See article: [[CRM_V_-_Control_Room_Master#DAK-48_Expansion_module|CRM - DAK48 Installation]]
+
To enable the use of the DAK48 module a license is required:
 
+
* 1009648001: [[Licenses#CRM-V_DAK_expansion|License for CRM-V DAK expansion]]
  
 +
Regardless if the CRM-V station is using one or two DAK48 modules, only one CRM-V DAK expansion license is required.
 +
{{note|The DAK-48 module is supported in '''ICX-AlphaCom mode''' only, not in Edge, Pulse or SIP mode.}}
  
 +
== Installing the DAK-48 Expansion module ==
 +
To interconnect the DAK-48 unit to the main unit, use the cable which is coming with the DAK-48 unit. The DAK-48 unit receive its power and data via this cable.
  
The IP DAK-48 unit expands the IP Flush Master station with an additional 48 Direct Access Keys. This unit can also be used with the IP OR Station and the IP Master Station Kit.
+
{{obs| A standard patch cable (1:1) must not be used. It might damage the unit!}}
  
Before installation, disconnect power from the IP Flush Master station
+
Installing the IP DAK-48 Unit:
 +
* Power off the IP Flush Master station by disconnecting the ethernet cable in the LAN port
 +
* Plug one end of the cable coming with the DAK-48 unit into the RJ45 port on the right hand side of the IP Flush Master station (when the station is viewed from the front).
 +
* Plug the other end of the cable into the left RJ45 port on the DAK-48 unit (when the unit is viewed from the front).
 +
* Power up the IP Flush Master station by connecting the ethernet cable to the LAN port
  
The accompanying RJ45-RJ45 cable is used to install the DAK unit on an IP Flush Master station. This cable has an RJ45 plug at both ends. The two ends are interchangeable. Up to two DAK units can be installed per station. Each DAK unit has two RJ45 ports, one located on the left side and one on the right side.
+
[[File:IP_Master_DAK-48_Unit_Installation.PNG]]
  
<u>'''To install the IP DAK-48 Unit:'''</u><br/>
 
* Plug one end of the RJ45-RJ45 cable into the RJ45 port on the right of the station (when the station is viewed from the front).
 
* Plug the other end of the RJ45-RJ45 cable into the left (when the unit is viewed from the front) RJ45 port on the DAK unit.
 
  
[[File:IP_Master_DAK-48_Unit_Installation.PNG]]<br/>
+
To add a second DAK unit, plug one end of an RJ45-RJ45 cable into the RJ45 port of the installed unit and plug the other end into the RJ45 port of the new unit.
Installing the IP DAK-48 Unit
 
To add another DAK unit, plug one end of an RJ45-RJ45 cable into the RJ45 port of  
 
the installed unit and plug the other end into the RJ45 port of the new unit.
 
 
<br style="clear:both;" />
 
<br style="clear:both;" />
  
===<u>[http://www.zenitel.com/product/ip-dak-48-unit Additional Documentation on Zenitel.com]</u>===
+
==Related articles==
 
+
* [[DAK-48 Module Dimensions & Mounting Instructions|Dimensions]]
===<u>Related article</u>===
+
* [[Back box on wall mount - 1008098600]]
* [[IP Flush Master - 1008031000]]
 
 
* [[Back box flush mount - 1008098700]]
 
* [[Back box flush mount - 1008098700]]
* [[Licenses#CRM-V_DAK_expansion|DAK expansion license]]
+
* [[Licenses#CRM-V_DAK_expansion|AlphaCom DAK expansion license 1009648001]]
 +
* [[Licenses for ICX-500 and ICX-AlphaCom Core]]
 +
* [http://www.zenitel.com/product/crm-v-dak48 Additional Documentation on Zenitel.com]
  
== Related products ==
+
==Related products ==
* Label Paper for IP DAK-48 Unit - 1008010101 (20 sheets)
+
* Label Paper for IP DAK-48 Unit - 1008010101 (1 sheet)
  
  
 
[[Category: INCA Backboxes and accessories]]
 
[[Category: INCA Backboxes and accessories]]
 +
[[Category: Turbine Backboxes and accessories]]

Latest revision as of 14:16, 29 January 2024

AI.png
DAK-48 Unit. Item number: 1008010100

The IP DAK-48 unit expands the:

with an additional 48 Direct Access Keys. Up to two DAK-48 units can be connected to one station.

Software and license requirements

Software:

  • IP Flush Master (INCA): Version 01.09.3.0 or later
  • IP Flush Master (Turbine): Version 6.0.3.0 or later
  • AMC-IP: Version 10.60.3.0 or later

License: To enable the use of the DAK48 module a license is required:

Regardless if the CRM-V station is using one or two DAK48 modules, only one CRM-V DAK expansion license is required.

Note icon The DAK-48 module is supported in ICX-AlphaCom mode only, not in Edge, Pulse or SIP mode.


Installing the DAK-48 Expansion module

To interconnect the DAK-48 unit to the main unit, use the cable which is coming with the DAK-48 unit. The DAK-48 unit receive its power and data via this cable.

OBS icon A standard patch cable (1:1) must not be used. It might damage the unit!


Installing the IP DAK-48 Unit:

  • Power off the IP Flush Master station by disconnecting the ethernet cable in the LAN port
  • Plug one end of the cable coming with the DAK-48 unit into the RJ45 port on the right hand side of the IP Flush Master station (when the station is viewed from the front).
  • Plug the other end of the cable into the left RJ45 port on the DAK-48 unit (when the unit is viewed from the front).
  • Power up the IP Flush Master station by connecting the ethernet cable to the LAN port

IP Master DAK-48 Unit Installation.PNG


To add a second DAK unit, plug one end of an RJ45-RJ45 cable into the RJ45 port of the installed unit and plug the other end into the RJ45 port of the new unit.

Related articles

Related products

  • Label Paper for IP DAK-48 Unit - 1008010101 (1 sheet)