Difference between revisions of "IP Flush Master DAK-48 Module"
From Zenitel Wiki
(→Installation) |
|||
Line 16: | Line 16: | ||
==Installation== | ==Installation== | ||
− | + | ===DAK-48 Expansion module=== | |
+ | The IP DAK-48 unit expands the IP Flush Master station with an additional 48 Direct Access Keys. Up to two DAK-48 units can be connected to one station. | ||
+ | To interconnect the DAK-48 unit to the main unit, use the cable which is coming with the DAK-48 unit. The DAK-48 unit receive its power and data via this cable. | ||
+ | '''WARNING:''' A standard patch cable (1:1) must not be used. It might damage the unit! | ||
+ | Installing the IP DAK-48 Unit: | ||
+ | * Power off the IP Flush Master station by disconnecting the ethernet cable in the LAN port | ||
+ | * Plug one end of the cable coming with the DAK-48 unit into the RJ45 port on the right hand side of the IP Flush Master station (when the station is viewed from the front). | ||
+ | * Plug the other end of the cable into the left RJ45 port on the DAK-48 unit (when the unit is viewed from the front). | ||
+ | * Power up the IP Flush Master station by connecting the ethernet cable to the LAN port | ||
− | + | [[File:IP_Master_DAK-48_Unit_Installation.PNG]] | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
Installing the IP DAK-48 Unit | Installing the IP DAK-48 Unit | ||
To add another DAK unit, plug one end of an RJ45-RJ45 cable into the RJ45 port of | To add another DAK unit, plug one end of an RJ45-RJ45 cable into the RJ45 port of |
Revision as of 12:49, 24 October 2016
- Item number: 1008010100
Note! The license 1009648001 is required to extend the IP Flush Master with the optional IP DAK-48 Unit.
Contents
Highlights
- Extends IP Flush Master Station with 48 programmable DAK keys (direct access keys)
- Ideal for control room applications
- Visual indications with two LEDs (green/red) per DAK key
- All keys have backlight (adjustable)
- Easy labeling of keys
Software requirements
- IP Flush Master: Version 01.09.3.0 or later
- AMC-IP: Version 10.60.3.0 or later
Installation
DAK-48 Expansion module
The IP DAK-48 unit expands the IP Flush Master station with an additional 48 Direct Access Keys. Up to two DAK-48 units can be connected to one station.
To interconnect the DAK-48 unit to the main unit, use the cable which is coming with the DAK-48 unit. The DAK-48 unit receive its power and data via this cable.
WARNING: A standard patch cable (1:1) must not be used. It might damage the unit!
Installing the IP DAK-48 Unit:
- Power off the IP Flush Master station by disconnecting the ethernet cable in the LAN port
- Plug one end of the cable coming with the DAK-48 unit into the RJ45 port on the right hand side of the IP Flush Master station (when the station is viewed from the front).
- Plug the other end of the cable into the left RJ45 port on the DAK-48 unit (when the unit is viewed from the front).
- Power up the IP Flush Master station by connecting the ethernet cable to the LAN port
Installing the IP DAK-48 Unit
To add another DAK unit, plug one end of an RJ45-RJ45 cable into the RJ45 port of the installed unit and plug the other end into the RJ45 port of the new unit.
Additional Documentation on Zenitel.com
Related article
Related products
- Label Paper for IP DAK-48 Unit - 1008010101 (20 sheets)