Actions

Difference between revisions of "IP Flush Master DAK-48 Module"

From Zenitel Wiki

(Installing the DAK-48 Expansion module)
(Related articles)
Line 25: Line 25:
  
 
==Related articles==
 
==Related articles==
 +
* [[DAK-48 Module Dimensions & Mounting Instructions|Dimensions]]
 
* [[IP Flush Master - 1008031000]]
 
* [[IP Flush Master - 1008031000]]
 
* [[Back box flush mount - 1008098700]]
 
* [[Back box flush mount - 1008098700]]
Line 30: Line 31:
 
* [http://www.zenitel.com/product/crm-v-dak48 Additional Documentation on Zenitel.com]
 
* [http://www.zenitel.com/product/crm-v-dak48 Additional Documentation on Zenitel.com]
  
===<u>Related products</u>===
+
==Related products ==
 
* Label Paper for IP DAK-48 Unit - 1008010101 (20 sheets)
 
* Label Paper for IP DAK-48 Unit - 1008010101 (20 sheets)
 
* License 1009648001 to extend the IP Flush Master with the IP DAK-48 Unit
 
* License 1009648001 to extend the IP Flush Master with the IP DAK-48 Unit

Revision as of 17:15, 16 March 2017

AlphaCom icon 300px.png
DAK-48 Unit. Item number: 1008010100

Software requirements

  • IP Flush Master: Version 01.09.3.0 or later
  • AMC-IP: Version 10.60.3.0 or later

Installing the DAK-48 Expansion module

The IP DAK-48 unit expands the IP Flush Master station with an additional 48 Direct Access Keys. Up to two DAK-48 units can be connected to one station.

To interconnect the DAK-48 unit to the main unit, use the cable which is coming with the DAK-48 unit. The DAK-48 unit receive its power and data via this cable.

WARNING: A standard patch cable (1:1) must not be used. It might damage the unit!

Installing the IP DAK-48 Unit:

  • Power off the IP Flush Master station by disconnecting the ethernet cable in the LAN port
  • Plug one end of the cable coming with the DAK-48 unit into the RJ45 port on the right hand side of the IP Flush Master station (when the station is viewed from the front).
  • Plug the other end of the cable into the left RJ45 port on the DAK-48 unit (when the unit is viewed from the front).
  • Power up the IP Flush Master station by connecting the ethernet cable to the LAN port

IP Master DAK-48 Unit Installation.PNG


To add a second DAK unit, plug one end of an RJ45-RJ45 cable into the RJ45 port of the installed unit and plug the other end into the RJ45 port of the new unit.

Related articles

Related products

  • Label Paper for IP DAK-48 Unit - 1008010101 (20 sheets)
  • License 1009648001 to extend the IP Flush Master with the IP DAK-48 Unit