Difference between revisions of "IP Flush Master DAK-48 Module"
From Zenitel Wiki
(→Installing the DAK-48 Expansion module) |
|||
Line 1: | Line 1: | ||
{{A}} [[File:1008010100.PNG|thumb|200px|DAK-48 Unit. Item number: 1008010100]] | {{A}} [[File:1008010100.PNG|thumb|200px|DAK-48 Unit. Item number: 1008010100]] | ||
The '''IP DAK-48 unit''' expands the [[IP Flush Master - 1008031000|IP Flush Master station]] with an additional 48 Direct Access Keys. Up to two DAK-48 units can be connected to one station. | The '''IP DAK-48 unit''' expands the [[IP Flush Master - 1008031000|IP Flush Master station]] with an additional 48 Direct Access Keys. Up to two DAK-48 units can be connected to one station. | ||
− | |||
− | |||
==Software and license requirements== | ==Software and license requirements== | ||
'''Software:''' | '''Software:''' | ||
Line 13: | Line 11: | ||
Regardless if the CRM-V station is using one or two DAK48 modules, only one CRM-V DAK expansion license is required. | Regardless if the CRM-V station is using one or two DAK48 modules, only one CRM-V DAK expansion license is required. | ||
− | + | {{note|The DAK-48 module is supported in '''AlphaCom mode''' only, not in Pulse or SIP mode.}} | |
== Installing the DAK-48 Expansion module == | == Installing the DAK-48 Expansion module == | ||
To interconnect the DAK-48 unit to the main unit, use the cable which is coming with the DAK-48 unit. The DAK-48 unit receive its power and data via this cable. | To interconnect the DAK-48 unit to the main unit, use the cable which is coming with the DAK-48 unit. The DAK-48 unit receive its power and data via this cable. |
Revision as of 13:49, 16 July 2018
The IP DAK-48 unit expands the IP Flush Master station with an additional 48 Direct Access Keys. Up to two DAK-48 units can be connected to one station.
Contents
Software and license requirements
Software:
- IP Flush Master: Version 01.09.3.0 or later
- AMC-IP: Version 10.60.3.0 or later
License: To enable the use of the DAK48 module a license is required:
- 1009648001: License for CRM-V DAK expansion
Regardless if the CRM-V station is using one or two DAK48 modules, only one CRM-V DAK expansion license is required.
Installing the DAK-48 Expansion module
To interconnect the DAK-48 unit to the main unit, use the cable which is coming with the DAK-48 unit. The DAK-48 unit receive its power and data via this cable.
Installing the IP DAK-48 Unit:
- Power off the IP Flush Master station by disconnecting the ethernet cable in the LAN port
- Plug one end of the cable coming with the DAK-48 unit into the RJ45 port on the right hand side of the IP Flush Master station (when the station is viewed from the front).
- Plug the other end of the cable into the left RJ45 port on the DAK-48 unit (when the unit is viewed from the front).
- Power up the IP Flush Master station by connecting the ethernet cable to the LAN port
To add a second DAK unit, plug one end of an RJ45-RJ45 cable into the RJ45 port of the installed unit and plug the other end into the RJ45 port of the new unit.
Related articles
- Dimensions
- IP Flush Master - 1008031000
- Back box flush mount - 1008098700
- DAK expansion license 1009648001
- Additional Documentation on Zenitel.com
Related products
- Label Paper for IP DAK-48 Unit - 1008010101 (20 sheets)