IP Flush Master DAK-48 Module
From Zenitel Wiki
Contents
Software requirements
- IP Flush Master: Version 01.09.3.0 or later
- AMC-IP: Version 10.60.3.0 or later
Installing the DAK-48 Expansion module
The IP DAK-48 unit expands the IP Flush Master station with an additional 48 Direct Access Keys. Up to two DAK-48 units can be connected to one station.
To interconnect the DAK-48 unit to the main unit, use the cable which is coming with the DAK-48 unit. The DAK-48 unit receive its power and data via this cable.
WARNING: A standard patch cable (1:1) must not be used. It might damage the unit!
Installing the IP DAK-48 Unit:
- Power off the IP Flush Master station by disconnecting the ethernet cable in the LAN port
- Plug one end of the cable coming with the DAK-48 unit into the RJ45 port on the right hand side of the IP Flush Master station (when the station is viewed from the front).
- Plug the other end of the cable into the left RJ45 port on the DAK-48 unit (when the unit is viewed from the front).
- Power up the IP Flush Master station by connecting the ethernet cable to the LAN port
To add a second DAK unit, plug one end of an RJ45-RJ45 cable into the RJ45 port of the installed unit and plug the other end into the RJ45 port of the new unit.
Related articles
- Dimensions
- IP Flush Master - 1008031000
- Back box flush mount - 1008098700
- DAK expansion license 1009648001
- Additional Documentation on Zenitel.com
Related products
- Label Paper for IP DAK-48 Unit - 1008010101 (20 sheets)