Actions

1-1a. Exchange startup (practice)

From Zenitel Wiki

Revision as of 15:37, 15 March 2011 by Asle (talk) (Exchange startup:)

Practice 1-1a:

System configuration


Exchange startup:

  • Install an ASLT board and an AMC-IP board
  • Connect two master stations to physical 1 and 2
  • Connect power and start the exchange
  • Perform a Coldstart (autoload)
  • Test calling and conversation between the two stations






Related articles