Actions

Difference between revisions of "1-2b. Analogue Stations – Substation (solution)"

From Zenitel Wiki

(Related articles)
Line 19: Line 19:
 
===Related articles ===
 
===Related articles ===
 
* [[1-2b. Analogue Stations – Substation (practice)]]
 
* [[1-2b. Analogue Stations – Substation (practice)]]
 
 
[[Category: AlphaCom practice]]
 

Revision as of 14:54, 17 March 2011

System configuration


Exercise

  • Connect a substation to physical port number 4
  • Configure the station number & name:
    • Physical 4: 104 Elevator
  • Configure the Call Button to call the Reception


Call capacity:

  • Make a call between the Elevator and the Reception
  • Make a second call between Mr. Edison and Mr. Einstein

What must be done to achieve two simultaneous conversations?




Related articles