Actions

Difference between revisions of "ECP-AA1 Dimensions & Mounting Instructions"

From Zenitel Wiki

(Onwall Surface Mounting)
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
{{APS}}
 
{{APS}}
{|border="1"
+
The ECP-AA1 is flush-mounted using 4 screw of type:
|width="250px"| 
+
* M4x16 DIN 7991 A4 - Flat Head Socket Cap Screw, Stainless Steel A4 DIN7991
|width="250px"|'''Dimensions (WxHxD)'''
+
* Length as required
|width="150px"|'''Weight'''
 
|-
 
|TCIS || 180 x 120 x 70 mm || 0.8 kg*
 
|-
 
|TCIS after flushmount || 180 x 120 x 20 mm ||
 
|-
 
|TCIS with onwall box || 180 x 120 x 82 mm ||
 
|-
 
|}
 
  
*) TCIS-2 weight: 1.0 kg
+
[[File:ECP-AA1 Dimensions.png|500px|'ECP-AA1 - Front and side view'']]
 
+
[[File:CutOut.png|400px|''Cut Out'']]
=TCIS Compact Station Dimensions=
 
[[File:TCAS Dimmensions-2.PNG|200px|''TCIS Compact Station - Front view'']]
 
[[File:TCIS Dimensions 1.PNG|200px|''TCIS Compact Station - Side view'']]
 
 
 
<br style="clear:both;" />
 
 
 
=Flush Mounting=
 
==Flush Mount 2-Gang Back Box - TA-2==
 
[[File:TA-2 dimensions.PNG|''TA2 2-Gang backbox dimensions'']]
 
 
 
'''Note!''' It is recommended to utilize back boxes with weep holes at the bottom
 
 
 
<br style="clear:both;" />
 
 
 
==Flush Mount Bracket - TA-5==
 
Fits US 2-GANG electrical boxes. Recommended screw diameter: up to M4 (5/32"). Use screw recommended by back box manufacurer.
 
 
 
[[File:TCAS Mounting-5.PNG|''TA-5 Mounting Bracket dimensions'']]
 
[[File:TCAS Mounting-6.PNG|''TA-5 Mounting Bracket'']]
 
 
 
'''Note!''' The TA-5 Bracket is mandatory for flush mounting.
 
  
 
<br style="clear:both;" />
 
<br style="clear:both;" />
  
==Flush Mounting Procedure==
 
[[File:TCIS Flush Mounting.PNG]]
 
 
:1.  Mount the 2-gang back box into the wall
 
:2.  Mount the bracket onto the back box
 
:3.  Fit the gasket onto the bracket with the ridged side facing down
 
::–Plug the Ethernet cable into the RJ-45 port on the station
 
:4.  Mount the Turbine station onto the bracket with the M5 fasteners provided
 
 
'''Ensure the station is mounted vertically with the microphone aperture facing down'''
 
  
'''Ensure there is enough clearance under the station so that the microphone aperture is not smothered'''
 
  
 
[[Category: Turbine Dimensions & Mounting Instructions]]
 
[[Category: Turbine Dimensions & Mounting Instructions]]

Latest revision as of 10:54, 23 October 2019

APS.png

The ECP-AA1 is flush-mounted using 4 screw of type:

  • M4x16 DIN 7991 A4 - Flat Head Socket Cap Screw, Stainless Steel A4 DIN7991
  • Length as required

'ECP-AA1 - Front and side view Cut Out